Building
41
– Main facility
- Approximately
13,500 sq. ft.
- 30 employees
|
Capabilities
- Mold construction
-Aluminum /Steel, prototype/production
- Design - Solidworks
, Mastercam
- Prototyping -
CNC machining, Silicone molds, Hand Cast Urethanes / Epoxies
- Available services
- SLA /SLS parts - Aluminum / Zink castings, painting
- Secondary machining
- Plastic, Aluminum, and Zinc
- RIM - Reaction
Injection Molding
- Secondary finishing
- Quality Control
|
Equipment
- 16 CNC Machines
- 2 EDM Sinkers
- CNC Lathe
- Lathe
- Surface grinder
- Bridgeport Series II
- 2 RIM molding stations
- Coordinate measurement machine
(Quality Control)
|
Building
80 - Molding
facility
- Approximately 16,000 sq. ft.
- 10 employees
|
Capabilities
- Plastic
Injection molding
- 2 RIM molding
stations
- Assembly
- Quality Control
|
Equipment
- Injection molding operations -
7 presses 150 - 500 ton
- RIM molding - 2 molding stations
- Optical comparator (QC)
- Sheffield Cordax Coordinate Measurement
System (CCM)
|